• Corrugated metal pipe arch
  • Corrugated metal pipe arch
  • Corrugated metal pipe arch
  • Corrugated metal pipe arch
Description
point when construction
(1) construction can be embankment installation or trench installation
(2) foundation adopt soft sand material
(3) when installation, adjust the span by The positioning telescopic pull rod
(4) when assembling, make waterproof well on bolts and overlap parts
(5) when fill height on both side to the max diameter, take the telescopic rod away, then go on filling.
Leave a message
First Name*
Last Name*
Email*
Message*